← Back to search

KingEdwardVII Deflection of lhd 108 due to water test conducted 4/7/03

AI summary (β)
寸法図・断面図と思われる図面資料で、戦艦「King Edward VII」の船体内部横断区画または構造部材配置と、水圧試験による「lhd 108」のたわみ量を扱う。上部に「King Edward VII」「Deflection of lhd 108 due to water test conducted 4/7/03」と注記があり、下部に尺度目盛を付す。細部数値は不鮮明。メタデータ上の艦船はBattleship、Japanese_aircraft_carrier_Kaga、所蔵は東京大学柏図書館。キーワード: King Edward VII, Deflection, lhd 108, water test, 4/7/03, 寸法図, 断面図, Battleship, Japanese_aircraft_carrier_KagaAuto-generated by Azure OpenAI gpt-5.5 from OCR text (which may contain errors) and image captions.
Item ID
eb3626d0-c262-4b33-b6a2-2c3871d2e2ff
Catalogue ID
21410701
Card catalogue
[Kaga, Tosa] "Battleship and Battlecruiser Rudder Calculations," etc.
Doc type
寸法図・断面図?
Category
主力艦:加賀型
Extent
Pen-written | 1 sheet
Holder
東京大学柏図書館
Year registered
2007
Warship
Battleship / Japanese_aircraft_carrier_Kaga
GCV entities
Drawing

Other items in the same card catalogue19 item(s)

Similar items24 item(s) (similar title / content)

King Edward VII
King Edward VII
船体線図
King Edward VII.
King Edward VII.
数値一覧メモ
COURSE OF AMMUNITION (King Edwards VII)
COURSE OF AMMUNITION (King Edwards VII)
COURSE OF AMMUNITION (King Edwards VII)
COURSE OF AMMUNITION (King Edwards VII)
KING EDWARDS VII, PLAN OF LOUVER MIDDLE DECK
KING EDWARDS VII, PLAN OF LOUVER MIDDLE DECK
Lighting, Flooring and Ventilating Arrangement in 12" and 6" magazine (King Edwards VII)
Lighting, Flooring and Ventilating Arrangement in 12" and 6" magazine (King Edwards VII)
12" Magazine aft, Platforms stowage with air tight metal lockers (King Edwards VII)
12" Magazine aft, Platforms stowage with air tight metal lockers (King Edwards VII)
King Edward VII. Blast Screens Side Sighting food 12" gun, Minatour Class Floor and Roller-path plate in 7.5" Barlette, Hiberuia fore 9.2" barlette, Minatour Riveting of K.N.C. Floors of 9.2" Barlette, King EdwardVII. Aft 12" barlette, Minatour 7.5" Gun S
King Edward VII. Blast Screens Side Sighting food 12" gun, Minatour Class Floor and Roller-path plate in 7.5" Barlette, Hiberuia fore 9.2" barlette, Minatour Riveting of K.N.C. Floors of 9.2" Barlette, King EdwardVII. Aft 12" barlette, Minatour 7.5" Gun S
1904
「% int of E.H.P. due to appindage」他
「% int of E.H.P. due to appindage」他
要目表
King Edward VII. Circle Turning Trials performed 24-11-04
King Edward VII. Circle Turning Trials performed 24-11-04
1904 · 旋回試験記録図
TORPEDO BOAT DESTROYER "KABA" RETURN OF ECONOMIC USE OF STEEL MATERIAL. FOR THE HULL CONSTRUCTION.
TORPEDO BOAT DESTROYER "KABA" RETURN OF ECONOMIC USE OF STEEL MATERIAL. FOR THE HULL CONSTRUCTION.
DUCOL STEEL (LETTERS FROM DAVID COLVILLE & SONS)
DUCOL STEEL (LETTERS FROM DAVID COLVILLE & SONS)
1924
NAVAL CONSTRUCTION DURING THE WAR.
NAVAL CONSTRUCTION DURING THE WAR.
論文(英文)
Naval Construction during the war
Naval Construction during the war
図面(イギリス軍艦一般配置図)
NAVAL CONSTRUCTION DURING THE WAR.
NAVAL CONSTRUCTION DURING THE WAR.
論文(英文)
H.I.J.M.S."KATORI"
H.I.J.M.S."KATORI"
図面
STERN CONSTRRUCTION/BOW CONSTRUCTION/MIDSHIP SECTION
STERN CONSTRRUCTION/BOW CONSTRUCTION/MIDSHIP SECTION
1927
MIDSHIP SECTION/BOW CONSTRUCTION/STERN CONSTRUCTION
MIDSHIP SECTION/BOW CONSTRUCTION/STERN CONSTRUCTION
(II)"Shannon" Protection to cylinders
(II)"Shannon" Protection to cylinders
軍艦断面図
A126 TRIM AT RIDDLED CONDITION
A126 TRIM AT RIDDLED CONDITION
BATTLE CRUISER "HIYEI" RETURN OF ECONOMIC USE OF STEEL MATERIAL. FOR THE HULL CONSTRUCTION.
BATTLE CRUISER "HIYEI" RETURN OF ECONOMIC USE OF STEEL MATERIAL. FOR THE HULL CONSTRUCTION.
〔軍艦天城deflection曲線他〕
〔軍艦天城deflection曲線他〕
B, C.及D 案  FORWARD SECTION  AFT SECTION
B, C.及D 案 FORWARD SECTION AFT SECTION
PLATING & FRAMING BEHIND FORWARD BARLETTE, SKETCH SHEWING RIVETING, King Edwards VII Section Ring Bulkhead in Middle Line Forward of After Barlette, Strucual Arrangement of 12" Barlette
PLATING & FRAMING BEHIND FORWARD BARLETTE, SKETCH SHEWING RIVETING, King Edwards VII Section Ring Bulkhead in Middle Line Forward of After Barlette, Strucual Arrangement of 12" Barlette