8 canvas(es) — paginate below the viewer, or use the Canvases tab on the right.
[Notes concerning warship construction costs]
- AI summary (β)
- Notes and calculation tables. Chiefly concerning estimates for warship construction costs, key industrial points, and materials for machinery, etc.; includes amounts by category, such as hull, launchers, torpedoes, completed products, and weapons; tables in English letters; and entries apparently comparing Kuma, nowara, etc. There is paper from the Department of Naval Architecture, Faculty of Engineering, Tokyo Imperial University, and extracts can also be seen concerning Akiyama, Mr. Chen Shaokuan, Mr. Chiang, and articles sent from Nanjing relating to a Chinese naval construction plan (six capital ships, etc.). Issued June 25, 1931. Keywords: warship construction costs, budgets, Department of Naval Architecture, Faculty of Engineering, Tokyo Imperial University, Chen Shaokuan, Mr. Chiang, Nanjing, Kuma, nowara, Chinese naval construction planAuto-generated by Azure OpenAI gpt-5.5 from OCR text (which may contain errors) and image captions.
- Item ID
- bf2911be-af4d-4953-aeaa-662dee77c515
- Catalogue ID
- 60091001
- Card catalogue
- [Construction cost; foreign orders]
- Category
- 軍艦建造:予算
- Issued
- 1931-06-25
- Holder
- 東京大学柏図書館
- Year registered
- 2007
- Warship
- Warship
- GCV entities
- Handwriting / Document / Diary / Diagram







































