← Back to search

3 canvas(es) — paginate below the viewer, or use the Canvases tab on the right.

Current Status of Work on Yaeyama, Engineer Lieutenant Hiraga, July 23, Meiji 35

AI summary (β)
Report dated July 23, Meiji 35, by Engineer Lieutenant Hiraga on the current status of work on Yaeyama. It records the progress and prospects for installation of “frames,” watertight work, rock-breaking, bottom measures, and pump tests in areas on the port and starboard sides of the vessel Yaeyama, including under the forward main magazine, the coal bunkers, under the feed tank, the forward part of the forward spear room, and the middle eel room. It states that progress on the starboard side has been limited because priority is being given to the port side, and describes measures for four damaged locations and for the list, as well as a policy of concentrating divers. Publication information unknown. Keywords: Yaeyama, Engineer Lieutenant Hiraga, Meiji 35, current status of work, watertight work, port side, starboard side, feed tank, coal bunker, diverAuto-generated by Azure OpenAI gpt-5.5 from OCR text (which may contain errors) and image captions.
Item ID
b18c8fbc-76cd-4cfa-a285-302df841b7c5
Catalogue ID
50533001
Card catalogue
[Related to salvage work on the warship Yaeyama]
Category
その他4:その他軍艦
Holder
東京大学柏図書館
Year registered
2007
Warship
Japanese_minelayer_Yaeyama / Warship
GCV entities
Drawing / Document / Handwriting

Other items in the same card catalogue24 item(s)

Similar items24 item(s) (similar title / content)