← Back to search

RESULTS OF TESTS OF SPECIMENS, attached documents to articles on the “Manchester” and “Armstrong” steel works

AI summary (β)
This item is a test report or attached document titled “RESULTS OF TESTS OF SPECIMENS,” appended to articles on the “Manchester” and “Armstrong” steel works. Its subject is the test results for specimens, but the main text is illegible in the OCR, and specific test items, numerical values, and names of persons involved cannot be confirmed. The date of issue is March 27, 1924; the category is reports related to overseas study, business trips, and postings; and the holding institution is the University of Tokyo Kashiwa Library. Keywords: RESULTS OF TESTS OF SPECIMENS, Manchester, Armstrong, steel works, test results, attached documents, 1924, overseas postingAuto-generated by Azure OpenAI gpt-5.5 from OCR text (which may contain errors) and image captions.
Item ID
8e0d3d0b-bdb9-4862-81af-c802dca52a32
Catalogue ID
40850701
Card catalogue
Attached documents to articles on the “Beardmore” steel works, etc.
Category
報告:海外留学・出張・駐在
Issued
1924-03-27
Extent
1 sheet
Holder
東京大学柏図書館
Year registered
2007
GCV entities
Document

Other items in the same card catalogue19 item(s)

Similar items24 item(s) (similar title / content)

熊野「リフト バイ スターン」ニ於ケルモノト鈴谷(熊野)計画時ニ於ケル(1/20L波)ノモノ 「ストレス」比較
熊野「リフト バイ スターン」ニ於ケルモノト鈴谷(熊野)計画時ニ於ケル(1/20L波)ノモノ 「ストレス」比較
曲線図
第二号 「ウェスチングハウス」計画蒸汽消費量曲線
第二号 「ウェスチングハウス」計画蒸汽消費量曲線
曲線図
「アーマーボールト」ニ就テ
「アーマーボールト」ニ就テ
ARMOUR BARS IN AND AROUND FUNNEL UPTAKES/ARRANGEMENT OF ARMOUR BOLTS/POSITION OF ARMOUR BOLTS AND DETAILS/ARMOUR BOLT/ARMOUR BOLT FOR MAIN DECK BATTERY SIDES AND BULKD HEADS/BOLTS FOR SECURING BELT ARMOUR TO STEM CASTING/FORWARD BARBETTESKETCH SHEWING RIV
ARMOUR BARS IN AND AROUND FUNNEL UPTAKES/ARRANGEMENT OF ARMOUR BOLTS/POSITION OF ARMOUR BOLTS AND DETAILS/ARMOUR BOLT/ARMOUR BOLT FOR MAIN DECK BATTERY SIDES AND BULKD HEADS/BOLTS FOR SECURING BELT ARMOUR TO STEM CASTING/FORWARD BARBETTESKETCH SHEWING RIV
公務記事
公務記事
メモ
RESULTS OF HAND STEERING (By 20 MEN) (9-9-17)
RESULTS OF HAND STEERING (By 20 MEN) (9-9-17)
ARMOUR BARS IN AND AROUND FUNNEL UPTAKES/ARRANGEMENT OF ARMOUR BOLTS/POSITION OF ARMOUR BOLTS AND DETAILS/ARMOUR BOLT/ARMOUR BOLT FOR MAIN DECK BATTERY SIDES AND BULKD HEADS/BOLTS FOR SECURING BELT ARMOUR TO STEM CASTING/AFTER MAIN DECK SCREEN BULKHEAD/DE
ARMOUR BARS IN AND AROUND FUNNEL UPTAKES/ARRANGEMENT OF ARMOUR BOLTS/POSITION OF ARMOUR BOLTS AND DETAILS/ARMOUR BOLT/ARMOUR BOLT FOR MAIN DECK BATTERY SIDES AND BULKD HEADS/BOLTS FOR SECURING BELT ARMOUR TO STEM CASTING/AFTER MAIN DECK SCREEN BULKHEAD/DE
1917
?YAEYAMA”RESUME OF RESULTS-STABILITY /八重山
?YAEYAMA”RESUME OF RESULTS-STABILITY /八重山
COST OF SPEED.〔英文雑誌記事抜粋〕
COST OF SPEED.〔英文雑誌記事抜粋〕
軍艦土佐「ショアーリングリバンド」位置変更提案図
軍艦土佐「ショアーリングリバンド」位置変更提案図
SHIPBUILDERS COSTS〔英文雑誌記事抜粋〕
SHIPBUILDERS COSTS〔英文雑誌記事抜粋〕
〔英海軍企業リスト〕
〔英海軍企業リスト〕
〔英海軍企業リスト〕
〔英海軍企業リスト〕
B.S."NAGATO" RESULTS OF CALCULATION OF BENDING AND SHEARING STRESSES.
B.S."NAGATO" RESULTS OF CALCULATION OF BENDING AND SHEARING STRESSES.
計算結果一覧表
〔新聞記事〕
〔新聞記事〕
記事抜粋
伊号装甲巡洋艦「ベルトアーモーワ」組立方報告
伊号装甲巡洋艦「ベルトアーモーワ」組立方報告
1912
B.S."ISE&HYUGA" RESULTS OF CALCULATION OF BENDING AND SHEARING STRESSES.
B.S."ISE&HYUGA" RESULTS OF CALCULATION OF BENDING AND SHEARING STRESSES.
数値一覧表
B.C."AMAG & AKAGI" RESULTS OF CALCULATION OF BENDING AND SHEARING STRESSES.
B.C."AMAG & AKAGI" RESULTS OF CALCULATION OF BENDING AND SHEARING STRESSES.
1921
〔英文雑誌記事抜粋〕
〔英文雑誌記事抜粋〕
〔英文雑誌記事抜粋〕
〔英文雑誌記事抜粋〕
〔英文雑誌記事抜粋〕
〔英文雑誌記事抜粋〕
〔英文雑誌記事抜粋〕
〔英文雑誌記事抜粋〕
〔英文雑誌記事抜粋〕
〔英文雑誌記事抜粋〕
DETAIL OF GRATING/BATTLESHIP METHOD OF LIFTING ARMOUR GRATINGS FOR ACCESS TO LADDRERS/BATTLESHIP ARMOUR GRATING IN FUNNEL HATCH/ARMOUR BOLTS/ELASTIC TIES TO ROLLER PATH SUPPORT
DETAIL OF GRATING/BATTLESHIP METHOD OF LIFTING ARMOUR GRATINGS FOR ACCESS TO LADDRERS/BATTLESHIP ARMOUR GRATING IN FUNNEL HATCH/ARMOUR BOLTS/ELASTIC TIES TO ROLLER PATH SUPPORT