← Back to search

Expenditure Table by Hull Work Category for the Newly Built Warship Toba, Works Section, Shipbuilding Department, Sasebo Naval Arsenal

AI summary (β)
The document type is an expenditure table, titled “Expenditure Table by Hull Work Category for the Newly Built Warship Dewa,” prepared by the Works Section, Shipbuilding Department, Sasebo Naval Arsenal. It lists expenditures by category of hull work, with items and amounts such as beams, bulkheads, decks, painting, and material costs. The date of completion is given as March 15, Meiji 45, and the date of keel laying as July 7, Meiji 44. Keywords: newly built warship Dewa, hull work, expenditure table, Sasebo Naval Arsenal, Works Section of the Shipbuilding Department, Meiji 45, keel laying, material costsAuto-generated by Azure OpenAI gpt-5.5 from OCR text (which may contain errors) and image captions.
Item ID
5f353718-c513-46ce-bb62-81a6ba6241b0
Catalogue ID
22590601
Card catalogue
“Tables of Hull Section Loading Weight and Man-Hours for the Light Cruisers Kiso, Tama, Natori, Sendai, and Furutaka,” etc.
Category
軍艦構造:その他
Holder
東京大学柏図書館
Year registered
2007
Warship
Cruiser / Japanese_cruiser_Furutaka / Light_cruiser / Warship