← Back to search

6 canvas(es) — paginate below the viewer, or use the Canvases tab on the right.

[Memo Relating to Warship Construction Costs]

AI summary (β)
This item is a memo or calculation table concerning warship construction costs, with the breakdown and comparison of construction budgets as its subject. The text consists mostly of numerical tables, with entries such as “TOTAL,” “Wage,” “material price,” “construction cost,” and “appended table,” and figures apparently representing monetary amounts, such as 61,000, 491,000, 2,474,000, and 3,191,000. Legible proper nouns include “Sendai (Mitsubishi ha),” “Mitsubishi,” and “Shiozaki Hirohiro.” The date and publication information are unknown. Keywords: warship construction, construction costs, budget, material price, construction cost, Wage, Sendai, Mitsubishi, appended table, calculation tableAuto-generated by Azure OpenAI gpt-5.5 from OCR text (which may contain errors) and image captions.
Item ID
50855e2e-d5df-4a06-a252-ccc343123b5b
Catalogue ID
60091501
Card catalogue
[Construction Cost; Foreign Orders]
Category
軍艦建造:予算
Holder
東京大学柏図書館
Year registered
2007
Warship
Warship
GCV entities
Diagram / Document / Sheet music / Handwriting

Other items in the same card catalogue16 item(s)

Similar items24 item(s) (similar title / content)