2 canvas(es) — paginate below the viewer, or use the Canvases tab on the right.
665-Ton Destroyer Hull Alignment [and Others]
- AI summary (β)
- A report dated December 6, Taishō 3, from the Shipbuilding Factory to Mr. Hiraga, Chief of New Construction, titled "Matter of Hull Alignment," together with an attachment, describing the method for hull alignment of a 665-ton destroyer. It covers establishing the hull centerline at the center of the upper deck; alignment of the frame sides; the leaning and inclination of bulkheads using the lower edge of the keel as a reference; differences in beam-end height; the provisional center of the shaft; the positions of the shaft tube and shaft brackets; and alignment of the hull center and bulkhead angles. The organization names Shipbuilding Factory and Navy appear. Keywords: 665-ton destroyer, hull alignment, Shipbuilding Factory, Mr. Hiraga, Chief of New Construction, keel, frame, bilge keel, shaft, bulkheadAuto-generated by Azure OpenAI gpt-5.5 from OCR text (which may contain errors) and image captions.
- Item ID
- 1a542711-7fca-49e4-b455-4624a19a075c
- Catalogue ID
- 22450101
- Card catalogue
- "Method for Oil-Proofing Work on Destroyer Kaba" and Others
- Category
- 駆逐艦
- Holder
- 東京大学柏図書館
- Year registered
- 2007
- GCV entities
- Document



































