← Back to search

2 canvas(es) — paginate below the viewer, or use the Canvases tab on the right.

665-Ton Destroyer Hull Alignment [and Others]

AI summary (β)
A report dated December 6, Taishō 3, from the Shipbuilding Factory to Mr. Hiraga, Chief of New Construction, titled "Matter of Hull Alignment," together with an attachment, describing the method for hull alignment of a 665-ton destroyer. It covers establishing the hull centerline at the center of the upper deck; alignment of the frame sides; the leaning and inclination of bulkheads using the lower edge of the keel as a reference; differences in beam-end height; the provisional center of the shaft; the positions of the shaft tube and shaft brackets; and alignment of the hull center and bulkhead angles. The organization names Shipbuilding Factory and Navy appear. Keywords: 665-ton destroyer, hull alignment, Shipbuilding Factory, Mr. Hiraga, Chief of New Construction, keel, frame, bilge keel, shaft, bulkheadAuto-generated by Azure OpenAI gpt-5.5 from OCR text (which may contain errors) and image captions.
Item ID
1a542711-7fca-49e4-b455-4624a19a075c
Catalogue ID
22450101
Card catalogue
"Method for Oil-Proofing Work on Destroyer Kaba" and Others
Category
駆逐艦
Holder
東京大学柏図書館
Year registered
2007
GCV entities
Document

Other items in the same card catalogue12 item(s)

Similar items24 item(s) (similar title / content)